chore(deps): update Django to 6.0.10 #9

Merged
exler merged 1 commit from camila/security-deps-2026-11 into main 2026-11-23 22:25:11 +01:00
Collaborator

Summary

Raise the Django minimum to 6.0.10 and lock exactly that patch release (was 6.0.5), with no other dependency changes. Upstream release notes include a multipart upload memory fix. No incompatible change surfaced in the tested app flows.

Verification

  • Python 3.13: uv lock --check, uv pip check, manage.py check, makemigrations --check --dry-run, and pytest -q -rs: 362 passed, including browser tests.
  • Multipart receipt upload and attachment persistence through the actual flow (OCR stubbed), oversized receipt rejection, and oversized attachment filtering (at the application's 10 MiB per-file limit).
  • Ruff reports one pre-existing E501 in fetch_exchange_rates.py:19, also reproduced on the unchanged base. No live OCR, production storage, or reverse proxy exercised.
## Summary Raise the Django minimum to 6.0.10 and lock exactly that patch release (was 6.0.5), with no other dependency changes. [Upstream release notes](https://docs.djangoproject.com/en/6.0/releases/6.0.10/) include a multipart upload memory fix. No incompatible change surfaced in the tested app flows. ## Verification - Python 3.13: `uv lock --check`, `uv pip check`, `manage.py check`, `makemigrations --check --dry-run`, and `pytest -q -rs`: 362 passed, including browser tests. - Multipart receipt upload and attachment persistence through the actual flow (OCR stubbed), oversized receipt rejection, and oversized attachment filtering (at the application's 10 MiB per-file limit). - Ruff reports one pre-existing E501 in `fetch_exchange_rates.py:19`, also reproduced on the unchanged base. No live OCR, production storage, or reverse proxy exercised.
chore(deps): update Django to 6.0.10
All checks were successful
Test and push Docker image / test (pull_request) Successful in 2m15s
Test and push Docker image / push (pull_request) Has been skipped
Test and push Docker image / test (push) Successful in 2m35s
Test and push Docker image / push (push) Successful in 1m2s
6a8fe91926
exler merged commit 6a8fe91926 into main 2026-11-23 22:25:11 +01:00
exler deleted branch camila/security-deps-2026-11 2026-11-23 22:25:11 +01:00
Sign in to join this conversation.
No reviewers
No milestone
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
exler/spendbee!9
No description provided.